Shandong Laixi Yueshi Mine Pit Restoration Project

Contaminated area: approximately 370,000 square metres


Wastewater treatment volume: approximately 6,000,000 cubic metres


Project highlights:

The largest acid mine drainage impoundment globally, with pH levels as low as 1.4, restored to pH 7;

Fluoride ion concentration in wastewater reached 490 ml/L – a concentration highly corrosive, capable of completely dissolving calcified bone tissue – reduced to 5 ml/L post-remediation;

Engineering implementation based on numerical modelling of spatio-temporal characteristics in large-scale mine pit water bodies and hydrodynamic chemical mixing.

Welcome to Follow our Wechat Official Account

Scan the QR-Code to Follow our WeChat Official

Account to Get the Latest News